Scope of Work:
Civil and grey structure work, electrical wiring suited to local infrastructure, false ceiling, paint and wall finishes, manager’s cabin, teller counters, lockers, and furniture — delivered as a full turnkey setup.
Location Challenge:
Khui Ratta’s mountainous terrain and distance from major supply hubs made material transportation and logistics significantly more difficult than urban projects, along with less consistent power supply.
Our Solution:
We pre-planned material procurement and transport in bulk batches to avoid delays, coordinated a realistic project timeline around terrain and weather conditions, and integrated backup power solutions to keep the branch operational despite an inconsistent grid supply.